Operation manual
148
ERQ100~14 ERQ125~250A7W1B
Inverter condensing unit
4PW51322-1
■
Recommended replacement cycle of wear parts
Table 2:
"Replacement Cycle" list
Contact your dealer for details.
■
Moving and discarding the unit
■
Contact your dealer for removing and reinstalling the total
unit. Moving units requires technical expertise.
■
This unit uses hydrofluorocarbon.
Contact your dealer when discarding this unit. It is required
by law to collect, transport and discard the refrigerant in
accordance with the "hydrofluorocarbon collection and
destruction" regulations.
N
OTES
Component
Inspection cycle
Maintenance cycle
(replacements and/
or repairs)
Air filter
1 year
5 years
High efficiency filter (Optional)
1 year
Fuse
10 years
Crankcase heater
8 years
NOTE
1.
Table 2 indicates main components.
Refer to your maintenance and inspection contract
for more details.
2.
Table 2 indicates recommended intervals of
replacement cycles. However, in order to keep the
unit operational as long as possible, maintenance
work may be required sooner.
Recommended intervals can be used for
appropriate maintenance design in terms of
budgetting maintenance and inspection fees.
NOTE
Damage due to taking apart or cleaning interiors of
units by anyone other than our authorised dealers may
not be included in the warranty.
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html
Содержание ERQ
Страница 2: ...http splitoff ru tehn doc html...
Страница 16: ...Combination Table ESIE09 05 6 General Information http splitoff ru tehn doc html...
Страница 22: ...Specifications ESIE09 05 12 Specifications http splitoff ru tehn doc html...
Страница 30: ...Functional Parts Layout ESIE09 05 20 Refrigerant Circuit http splitoff ru tehn doc html...
Страница 52: ...Outline of Control ESIE09 05 42 Function http splitoff ru tehn doc html...
Страница 63: ...ESIE09 05 Wiring Diagram of Control Box Control Box 53 3 2 F box http splitoff ru tehn doc html...
Страница 127: ...ESIE09 05 Installation and Operation Manual 117 Part 8 Installation and Operation Manual http splitoff ru tehn doc html...
Страница 240: ...Wiring Diagrams ESIE09 05 230 Appendix 2 2 Field Wiring ERQ 100 125 140 A7V1B http splitoff ru tehn doc html...