Basic Control
ESIE09-05
24
Function
2.2 Compressor PI Control
2.2.1 For Z-Control
Carries out the compressor capacity PI control to maintain Te at constant during cooling
operation and Tc at constant during heating operation to ensure stable unit performance.
[Cooling operation]
[Heating operation]
2.2.2 For X-, Y-Control
For T
e
, T
c
: see field settings
2.2.3 Frequencies ERQ 100/125/140
Controls compressor capacity to adjust Te to
achieve target value (TeS).
Te : Low pressure equivalent saturation temperature
(°C)
Te setting (Set in Set-up mode 2)
TeS : Target Te value
(Varies depending on Te setting, operating
frequency, etc.)
L
M (Normal)
(factory
setting)
H
3
6
9
Controls compressor capacity to adjust Tc to
achieve target value (TcS).
Tc : High pressure equivalent saturation temperature
(°C)
Tc setting
TcS : Target Tc value
(Varies depending on Tc setting, operating
frequency, etc.)
L
M (Normal)
(factory
setting)
H
43
46
49
STn
INV(Fullload) INV(Unload)
STn
INV(Fullload) INV(Unload)
STn
INV(Fullload) INV(Unload)
1
36.0Hz
11
80.0Hz
21
140.0Hz
2
39.0Hz
12
86.0Hz
22
146.0Hz
3
43.0Hz
13
92.0Hz
23
152.0Hz
4
47.0Hz
14
98.0Hz
24
158.0Hz
5
52.0Hz
15
104.0Hz
25
164.0Hz
6
52.0Hz
57.0Hz
16
110.0Hz
26
170.0Hz
7
57.0Hz
64.0Hz
17
116.0Hz
27
175.0Hz
8
62.0Hz
71.0Hz
18
122.0Hz
28
180.0Hz
9
68.0Hz
78.0Hz
19
128.0Hz
29
185.0Hz
10
74.0Hz
20
134.0Hz
30
190.0Hz
31
195.0Hz
∗
Compressors may operate in a pattern other than those listed in above tables subject to the operating conditions.
Selection of full load operation to/from unload operation is made with the unload circuit solenoid valve
(Y3S=SVUL). The full load operation is performed with the SVUL set to OFF, while the unload operation is
performed with the SVUL set to ON.
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html
Содержание ERQ
Страница 2: ...http splitoff ru tehn doc html...
Страница 16: ...Combination Table ESIE09 05 6 General Information http splitoff ru tehn doc html...
Страница 22: ...Specifications ESIE09 05 12 Specifications http splitoff ru tehn doc html...
Страница 30: ...Functional Parts Layout ESIE09 05 20 Refrigerant Circuit http splitoff ru tehn doc html...
Страница 52: ...Outline of Control ESIE09 05 42 Function http splitoff ru tehn doc html...
Страница 63: ...ESIE09 05 Wiring Diagram of Control Box Control Box 53 3 2 F box http splitoff ru tehn doc html...
Страница 127: ...ESIE09 05 Installation and Operation Manual 117 Part 8 Installation and Operation Manual http splitoff ru tehn doc html...
Страница 240: ...Wiring Diagrams ESIE09 05 230 Appendix 2 2 Field Wiring ERQ 100 125 140 A7V1B http splitoff ru tehn doc html...