Operation with 0–10 V capacity control
The 0–10 V input is only used for this system of operation and is the
base of the capacity control.
This system needs a field supplied controller with a temperature
sensor. The temperature sensor can be used to control any
temperature:
■
Suction air of the air handling unit
■
Room air
■
Discharge air of the air handling unit
Program the field supplied controller to generate a 0–10 V signal
within conditions as listed. Also refer to the graphic and further data
in this paragraph for more details.
■
When target temperature is reached: 5 V
■
When lower refrigerant temperature is needed: 5–10 V
■
When higher refrigerant temperature is needed: 0–5 V
Operation with fixed T
e
/T
c
temperature control
The evaporating temperature (
T
e
)/condensing temperature (
T
c
) at
which the application has to operate can be set by code numbers as
listed below.
Operation setting in case of power failure
A
Controller voltage output to EKEQFCB
Capacity increase area
Capacity decrease area
Voltage output = linear function with
Δ
T
Δ
T
= [actual measured temperature] – [target temperature]
When
Δ
T=0, the target temperature is reached.
Δ
T
max
= maximum temperature variation as defined by installation
Recommended value for
Δ
T
max
=[1°C~5°C].
Δ
T (°C)
–
Δ
T
max
0
+
Δ
T
max
Voltage output from controller
(field supply)
0 V
5 V
10 V
0
–
Δ
Tmax
+
Δ
Tmax
Δ
T=0
5
10 V
°C
A
Mode No.
Code No.
Description of setting
(*)
(*) Depending on the operating temperature condition or on selection of the air
handling unit, operation or safety activation of the outdoor unit may take priority
and actual T
e
/T
c
will be different from the set T
e
/T
c
.
13(23)–1
01
T
e
= 3°C
02
T
e
= 4°C
03
T
e
= 5°C
04
T
e
= 6°C (factory setting)
05
T
e
= 7°C
06
T
e
= 8°C
07
T
e
= 9°C
08
T
e
= 10°C
13(23)–2
01
T
c
= 43°C
02
T
c
= 44°C
03
T
c
= 45°C
04
T
c
= 46°C (factory setting)
05
T
c
= 47°C
06
T
c
= 48°C
07
T
c
= 49°C
Measures must be taken to ensure that after power failure,
T1/T2 is according to the setting of your preference.
Neglecting this caution will result in improper operation.
Mode No.
Code No.
Description of setting
12(22)–5
01
T1/T2 must be open at power
restore.
(*)
(*) After power failure, T1/T2 must be changed to open (no cooling/heating
requested).
02
After power failure, the status of
T1/T2 must remain identical to the
initial T1/T2 status prior to the power
failure.
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html
Содержание ERQ
Страница 2: ...http splitoff ru tehn doc html...
Страница 16: ...Combination Table ESIE09 05 6 General Information http splitoff ru tehn doc html...
Страница 22: ...Specifications ESIE09 05 12 Specifications http splitoff ru tehn doc html...
Страница 30: ...Functional Parts Layout ESIE09 05 20 Refrigerant Circuit http splitoff ru tehn doc html...
Страница 52: ...Outline of Control ESIE09 05 42 Function http splitoff ru tehn doc html...
Страница 63: ...ESIE09 05 Wiring Diagram of Control Box Control Box 53 3 2 F box http splitoff ru tehn doc html...
Страница 127: ...ESIE09 05 Installation and Operation Manual 117 Part 8 Installation and Operation Manual http splitoff ru tehn doc html...
Страница 240: ...Wiring Diagrams ESIE09 05 230 Appendix 2 2 Field Wiring ERQ 100 125 140 A7V1B http splitoff ru tehn doc html...