ESIE09-05
Field Setting
Test Operation
97
(5.2) Y-control
Cooling: T
e
set
- T
e
real
= A
If A > B for C minutes, thermo off is applied for C minutes.
Heating: T
c
real
- T
c
set
= A
If A > B for C minutes, thermo off is applied for C minutes.
After C minutes, the units starts to operate.
(5.3) Z-control
Standard Daikin thermostat on/off control.
(6) Target Refrigerant Temperature Setting
(6.1) X-control
Cooling: Upper & lower limit of T
e
can be chosen
Mode n° setting
Setting switch n° Setting position n°
Setting
B (°C)
C (min)
51
2
00
2
3
01
4
3
02
6
3
03
8
3
04
2
5
05
4
5
06
6
5
07
8
5
08
2
7
09
4
7
10
6
7
11
8
7
12
2
10
13
4
10
14
6
10
15
8
10
Mode n° setting
Setting switch n° Setting position n°
Setting
Lower limit T
e
(°C)
Upper limit T
e
(°C)
51
1
00
-7
20
01
-3
20
02
0
20
03
3
20
04
-7
15
05
-3
15
06
0
15
07
3
15
08
-7
10
09
-3
10
10
0
10
11
3
10
12
-7
8
13
-3
8
14
0
8
15
3
8
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html
Содержание ERQ
Страница 2: ...http splitoff ru tehn doc html...
Страница 16: ...Combination Table ESIE09 05 6 General Information http splitoff ru tehn doc html...
Страница 22: ...Specifications ESIE09 05 12 Specifications http splitoff ru tehn doc html...
Страница 30: ...Functional Parts Layout ESIE09 05 20 Refrigerant Circuit http splitoff ru tehn doc html...
Страница 52: ...Outline of Control ESIE09 05 42 Function http splitoff ru tehn doc html...
Страница 63: ...ESIE09 05 Wiring Diagram of Control Box Control Box 53 3 2 F box http splitoff ru tehn doc html...
Страница 127: ...ESIE09 05 Installation and Operation Manual 117 Part 8 Installation and Operation Manual http splitoff ru tehn doc html...
Страница 240: ...Wiring Diagrams ESIE09 05 230 Appendix 2 2 Field Wiring ERQ 100 125 140 A7V1B http splitoff ru tehn doc html...