ESIE09-05
Field Setting
Test Operation
115
3.2.4 Setting of Refrigerant Recovery Mode
When carrying out the refrigerant collection on site, fully open the respective expansion valve.
All outdoor unit’s operation is prohibited.
[Operation procedure]
c
In “Setting Mode 2” with units in stop mode, set 21 “Refrigerant Recovery / Vacuuming
mode” to ON. The respective expansion valve of the units are fully opened. “TEST
OPERATION” is displayed on the remote controller, and the outdoor unit operation is
prohibited.
After setting, do not cancel “Setting Mode 2” until completion of refrigerant recovery
operation.
d
Collect the refrigerant using a refrigerant recovery unit. (See the operation manual attached
to the refrigerant recovery unit for more detal.)
e
Press Mode button “BS1” once and reset “Setting Mode 2”.
3.2.5 Setting of Vacuuming Mode
In order to perform vacuuming operation at site, fully open the expansion valves and turn on
some solenoid valves.
[Operating procedure]
c
In “Setting Mode 2” with units in stop mode, set “B Refrigerant Recovery / Vacuuming mode”
to ON. The respective expansion valves are fully opened. “TEST OPERATION” is displayed
on the remote controller, and the outdoor unit operation is prohibited.
After setting, do not cancel “Setting Mode 2” until completion of Vacuuming operation.
d
Use the vacuum pump to perform vacuuming operation.
e
Press Mode button “BS1” once and reset “Setting Mode 2”.
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html
Содержание ERQ
Страница 2: ...http splitoff ru tehn doc html...
Страница 16: ...Combination Table ESIE09 05 6 General Information http splitoff ru tehn doc html...
Страница 22: ...Specifications ESIE09 05 12 Specifications http splitoff ru tehn doc html...
Страница 30: ...Functional Parts Layout ESIE09 05 20 Refrigerant Circuit http splitoff ru tehn doc html...
Страница 52: ...Outline of Control ESIE09 05 42 Function http splitoff ru tehn doc html...
Страница 63: ...ESIE09 05 Wiring Diagram of Control Box Control Box 53 3 2 F box http splitoff ru tehn doc html...
Страница 127: ...ESIE09 05 Installation and Operation Manual 117 Part 8 Installation and Operation Manual http splitoff ru tehn doc html...
Страница 240: ...Wiring Diagrams ESIE09 05 230 Appendix 2 2 Field Wiring ERQ 100 125 140 A7V1B http splitoff ru tehn doc html...