EKEQMCBV3
Option kit for combination of Daikin condensing units
with field supplied air handling units
4PW52447-1
Installation and operation manual
79
Connecting the wiring: EKEQMCBV3
■
Connect the wires to the terminal board according to the wiring
diagram in figure 2. See figure 3 for wiring intake in the control
box. The wiring intake hole indication H1 refers to the H1 cable
of the corresponding wiring diagram. There are 2 wiring intake
holes to allow for branching of the communication wire.
■
Connect cables according to specifications of the next table.
Table connection and application
Wiring diagram
A1P.....................Printed circuit board
A2P.....................Printed circuit board (option KRP4)
F1U.....................Fuse (250 V, F5A)(A1P)
F3U.....................Field fuse
HAP ....................Light emitting diode (service monitor-green)
K1R.....................Magnetic relay
K4R.....................Magnetic relay (fan)
Q1DI ...................Earth leakage breaker
R1T .....................Thermistor (air)
R2T.....................Thermistor (liquid)
R3T.....................Thermistor (gas)
R7 .......................Capacity adaptor
T1R.....................Transformer (220 V/21.8 V)
X1M,X3M............Terminal block
Y1E.....................Electronic expansion valve
X1M-C1/C2.........Output: fan ON/OFF
X1M-F1/F2..........Communication outdoor unit
X1M-P1/P2 .........Communication remote controller
X1M-R1/R2.........Thermistor liquid
X1M-R3/R4.........Thermistor gas
X1M-R5/R6.........Thermistor air
X1M-T1/T2..........Input: ON/OFF
X1M-Y1~6 ..........Expansion valve
........... Field wiring
L......................... Live
N ........................ Neutral
,
.......... Connector
......................... Wire clamp
...................... Protective earth (screw)
............... Separate component
............... Optional accessory
BLK.................... Black
BLU.................... Blue
BRN ................... Brown
GRN................... Green
GRY ................... Gray
ORG .................. Orange
PNK ................... Pink
RED ................... Red
WHT .................. White
YLW ................... Yellow
Description
Connect to
Type of cable
Cross section
(mm
2
)
(*)
Maximum length
(m)
Specifications
L, N,
earth
Power supply
Power supply
H05VV-F3G2.5
2.5
—
Power supply 230 V 1~ 50 Hz
Y1~Y6
Expansion valve
connection
Expansion valve kit
LIYCY3 x 2 x 0.75
0.75
20
Digital output 12 V DC
R1,R2
Thermistor R2T
(liquid pipe)
—
H05VV-F2 x 0.75
Standard: 2.5
Max.: 20
Analog input 16 V DC
R3,R4
Thermistor R3T
(gas pipe)
R5,R6
Thermistor R1T (air)
P1,P2
Remote controller
100
Communication line 16 V DC
F1,F2
Communication to
outdoor unit
Outdoor unit
T1,T2
ON/OFF
Controller field supply
—
Digital input 16 V DC
LIYCY4 x 2 x 0.75
Optional connection: when the function of the switch box needs to be
extended: see KRP4A51 for details of settings and instructions.
—
Capacity step
—
Error signal
—
Operation signal
C1,C2
Fan signal
Air handling unit fan
field supply
H05VV-F3G2.5
2.5
—
Digital output: voltage free.
Maximum 230 V, maximum 2 A
(*) Recommended size (all wiring must comply with local codes).
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html
Содержание ERQ
Страница 2: ...http splitoff ru tehn doc html...
Страница 16: ...Combination Table ESIE09 05 6 General Information http splitoff ru tehn doc html...
Страница 22: ...Specifications ESIE09 05 12 Specifications http splitoff ru tehn doc html...
Страница 30: ...Functional Parts Layout ESIE09 05 20 Refrigerant Circuit http splitoff ru tehn doc html...
Страница 52: ...Outline of Control ESIE09 05 42 Function http splitoff ru tehn doc html...
Страница 63: ...ESIE09 05 Wiring Diagram of Control Box Control Box 53 3 2 F box http splitoff ru tehn doc html...
Страница 127: ...ESIE09 05 Installation and Operation Manual 117 Part 8 Installation and Operation Manual http splitoff ru tehn doc html...
Страница 240: ...Wiring Diagrams ESIE09 05 230 Appendix 2 2 Field Wiring ERQ 100 125 140 A7V1B http splitoff ru tehn doc html...