Installation and operation manual
78
EKEQMCBV3
Option kit for combination of Daikin condensing units
with field supplied air handling units
4PW52447-1
I
NSTALLATION
OF
THE
ELECTRICAL
CONTROL
BOX
(See figure 3)
Mechanical installation
1
Fix the control box with its hanger brackets to the mounting
surface.
Use 4 screws (for holes of Ø6 mm).
2
Open the lid of the control box.
3
For electrical wiring: refer to paragraph "Electric wiring work" on
page 78.
4
Install the screw nuts.
5
Close the unnecessary openings with stoppers (closing cups).
6
Close the lid securely after installation to ensure that the control
box is watertight.
E
LECTRIC
WIRING
WORK
■
All field supplied parts and materials and electric works must be
conform to local codes.
■
Use copper wire only.
■
All wiring must be performed by an authorized electrician.
■
A main switch or other means for disconnection, having a
contact separation in all poles, must be incorporated in the fixed
wiring in accordance with relevant local and national legislation.
■
Refer to the installation manual attached to the outdoor unit for
the size of power supply electric wire connected to the outdoor
unit, the capacity of the circuit breaker and switch, wiring and
wiring instructions.
■
Attach the earth leakage circuit breaker and fuse to the power
supply line.
Connection of the wires inside the control box
1
For connection to outdoor unit and to controller (field supply):
Pull the wires inside through the screw nut and close the nut
firmly in order to ensure a good pull relieve and water protection.
2
The cables require an additional pull-
relief. Strap the cable with the installed tie
wrap.
Precautions
■
Thermistor cable and remote controller wire should be located at
least 50 mm away from power supply wires and from wires to
the controller. Not following this guideline may result in
malfunction due to electrical noise.
■
Use only specified wires, and tightly connect wires to the
terminals. Keep wiring in neat order so that it does not obstruct
other equipment. Incomplete connections could result in
overheating, and in worse case electric shock or fire.
1
Control box
2
Hanger brackets
3
Main PCB
4
Transformer
5
Terminal
6
Optional PCB (KRP4)
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html
Содержание ERQ
Страница 2: ...http splitoff ru tehn doc html...
Страница 16: ...Combination Table ESIE09 05 6 General Information http splitoff ru tehn doc html...
Страница 22: ...Specifications ESIE09 05 12 Specifications http splitoff ru tehn doc html...
Страница 30: ...Functional Parts Layout ESIE09 05 20 Refrigerant Circuit http splitoff ru tehn doc html...
Страница 52: ...Outline of Control ESIE09 05 42 Function http splitoff ru tehn doc html...
Страница 63: ...ESIE09 05 Wiring Diagram of Control Box Control Box 53 3 2 F box http splitoff ru tehn doc html...
Страница 127: ...ESIE09 05 Installation and Operation Manual 117 Part 8 Installation and Operation Manual http splitoff ru tehn doc html...
Страница 240: ...Wiring Diagrams ESIE09 05 230 Appendix 2 2 Field Wiring ERQ 100 125 140 A7V1B http splitoff ru tehn doc html...