Field Setting
ESIE09-05
112
Test Operation
Setting of Demand Operation
By connecting the external contact input to the demand input of the outdoor unit external control
adaptor (optional), the power consumption of unit operation can be saved suppressing the
compressor operating condition.
When the normal demand operation is carried out. (Use of the external control adaptor
for outdoor unit is not required.)
1. While in "Setting mode 2", make setting of the set item No. 32 (Setting of constant demand)
to "ON".
2. While in "Setting mode 2", select the set item No. 30 (Setting of Demand 1 level) and then
set the setting condition to targeted mode.
Image of operation
Set item
Condition
Content
Demand
Mode 1
The compressor operates at approx. 60% or less of rating.
Mode 2
The compressor operates at approx. 70% or less of rating.
Mode 3
The compressor operates at approx. 80% or less of rating.
(V3082)
The power consumption set with "Demand 1 level setting".
When the
"Normal demand
setting" is set to ON
("OFF" has been set
at factory.) , the
power consumption
can be set with the
"Demand 1 level
setting". ("70 % of
rated power
consumption" has
been set at factory.)
Power consumption
Rated power consumption
80 % of rated power consumption
70 % of rated power consumption
60 % of rated power consumption
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html
Содержание ERQ
Страница 2: ...http splitoff ru tehn doc html...
Страница 16: ...Combination Table ESIE09 05 6 General Information http splitoff ru tehn doc html...
Страница 22: ...Specifications ESIE09 05 12 Specifications http splitoff ru tehn doc html...
Страница 30: ...Functional Parts Layout ESIE09 05 20 Refrigerant Circuit http splitoff ru tehn doc html...
Страница 52: ...Outline of Control ESIE09 05 42 Function http splitoff ru tehn doc html...
Страница 63: ...ESIE09 05 Wiring Diagram of Control Box Control Box 53 3 2 F box http splitoff ru tehn doc html...
Страница 127: ...ESIE09 05 Installation and Operation Manual 117 Part 8 Installation and Operation Manual http splitoff ru tehn doc html...
Страница 240: ...Wiring Diagrams ESIE09 05 230 Appendix 2 2 Field Wiring ERQ 100 125 140 A7V1B http splitoff ru tehn doc html...