G720-Install-IG101 Installation Guide
Brocade
®
G720 Switch Hardware Installation Guide
Time and Items Required
Allow 15 to 30 minutes to complete the installation.
The following items are required to install the device using the Universal Four-Post Rack Kit:
•
No. 2 Phillips torque screwdriver
•
1/4-in. slotted-blade torque screwdriver
Parts List
The following parts are provided with the 1U, 1.5U, and 2U Universal Four-Post Rack Kit (XBR-R000296):
Figure 3: Universal Four-Post Rack Kit Parts
1. Front Brackets (2)
G720-Install-IG101
21
Broadcom
Содержание Brocade G720
Страница 86: ......