Programming manual SCU-series
HB-37500-820-10-12F-EN SCU Programming manual
Page 77 of 252
Status: 19.03.2021
Slaves for IOs:
•
Beckoff EL …
(IO unit by Beckoff)
•
SIO-
…
(Safe IO
–
input data and output data BBH)
•
SDC
(
–
reading in of external IO data einlesen LT-i)
Figure 52: selection of Slaves
NOTICE:
These units are predefined and are available at the installation of the SafePLC
2
. Other units can
be inserted by the user (see below).In the wiring plan, a proper sheet is created for each
incorporated unit.
Figure 53: One sheet per unit
According to the example, the following Slave units are inserted:
•
SDU
- automatic gate
–
switch cabinet 1, hall 13
–
unit byBBH
•
SIO
- back of gate
–
switch cabinet 4, hall 13
–
unit by BBH
•
SIO
- automatic gate
–
switch cabinet, hall 15
–
unit by BBH
•
SDC
- reading in of data from central barrier
–
unit byLT-i