Programming manual SCU-series
HB-37500-820-10-12F-EN SCU Programming manual
Page 71 of 252
Status: 19.03.2021
Note:
The program connects the first and the last control point with the corresponding function
block connector. The input-output connector is not seen as a control point. Thus, it does not neeed
to be entered.
3. Definition of peripheral devices in the function plan
The function plan shows the logic modules and their interconnections. Peripheral devices that have
not yet been incorporated into a function plan are marked with a green arrow. The arrow indicates
that these elements can be dragged and into the function plan and can be inserted.
Figure 47 Inserting the input module
4. Definition of monitoring functions and logic modules in the function plan
The function plan shows the logic modules and their interconnections.
Programming of the function plan by:
•
Logic elements and processing elements.
•
Timers, Flipflops (releasing elements) and terminal blocks.
•
Monitoring modules for drive monitoring (Drive monitoring only possible if the
corresponding sensors have been defined.).
After their selection, the necessary modules are interconnected.
For this
purpose, drag the
cursor over a “Start
connector
“.
Use the left mouse button to click on the start
connector. By doubleclicking, the start connector is connected to a “
target connector
“.
For further
information, cf. the chapter “circuit“
.