140
−
an additional system of oil supplying to the pump with ad-
justed pressure up to 0,4 MPa (4 kgf/cm
2
) and system of com-
pressed air supplying, air pressure should be gradually adjusted
in the range 0…0,15 MPa (0…1,5 kgf/cm
2
).
The equipment and the stand instruments should meet the re-
quirements of GOST 10758-95.
For monitoring fuel pumps of a high pressure except for stands
the following equipment is necessary:
−
the weighting machine of middle class accuracy on GOST
29329-92;
−
the arrangement for the control of the governor action be-
ginning
Т
9597-111;
−
the arrangement for the control of the tappet rise
Т
9590-36.
The tests of pumps should be carried out with the clean diesel
fuel of the mark
Л
on GOST 305-82 or special liquid consisting of
mixture of above fuel with industrial oil on GOST 20799-88, aircraft
oil on GOST 21743-76 or lighting kerosene on TU 38.401-58-10-90,
having viscosity 5-6
мм
2
/s (cCt) at temperature 20±0,5
°
С
.
Application of a mix of the hydraulic medium consisting of
40 %
РЖ
-3 TU 38.101.964-83 and 60 %
РЖ
-8 TU 38.101.883-33,
having viscosity from 5 up to 6
мм
2
/s (
сС
t) at temperature (20±5)
°
С
is
supposed.
The temperature of fuel measured in final connection of the
stand the fuel pipe to the tested pump, at monitoring size and non-
uniformity of cyclic feedinges should be (32±2)
°
С
.
Before installation of the pump on the stand check up the axial
play of the camshaft. If the play exceeds 0,1 mm - adjust it with adjust-
ing shims within of 0,01…0,07 mm.
The camshaft should be free rotate on the bearings at tightened
bearing cover screws
The check and adjusting of the fuel pump should be carried out
at stand set of injectors of 261-03C model, having effective throughput
section
µ
ƒ= 0,283 mm
2
.
It is allowed to check and to adjust the fuel pump with a work-
ing set of checked injectors. The every injector should be assigned to
the certain section of the fuel pump, and then the injector should be
installed in the order of it assignment to the pump section.
For stand set of high pressure pipelines it is necessary to apply
the pipes with length 415
±
3 mm, the difference in throughput of pipe-
lines, should not exceed 1 mm
3
/cycles.
Содержание ???-238??
Страница 18: ...18 Fig 4 Overall Dimensions of Power Units 238 2 238 238 2 238 18...
Страница 20: ...20 Fig 6 Engine Longi tudinal Section...
Страница 38: ...38...
Страница 213: ...213...
Страница 225: ...225...