
Connecting cables to the Communication Server 1000
system
Introduction
The following items are connected to the back of the Media Gateway or Media Gateway
Expansion:
• multi I/O cable (NTRH0912)
This cable establishes the connection to the modem, ELAN subnet , and Avaya server
subnet.
• Media Gateway or Media Gateway Expansion power cord with two ferrites
You must connect the multi I/O cable first before connecting the power cord, because the power
cord routes above the multi I/O cable connection.
To connect the cables
1. On the rear of the Media Gateway or Media Gateway Expansion, locate the
connector associated with the first slot occupied by the 201i server.
2. Connect the NTRH0912 multi I/O cable as follows:
a. Loosen the connector's Velcro fastening strap.
b. Connect the amphenol connector on the NTRH0912 multi I/O cable to
the connector on the back of the Media Gateway or Media Gateway
Expansion.
c. Secure the connection by tightening the retaining screw and Velcro
fastening strap of the conductor.
The following diagram shows how to secure the multi I/O cable
connection:
Connecting cables to the Communication Server 1000 system
Avaya CallPilot
®
201i Server Hardware Installation
December 2010 91
Содержание CallPilot 201i
Страница 1: ...Avaya CallPilot 201i Server Hardware Installation 5 0 NN44200 301 01 03 December 2010 ...
Страница 8: ...8 Avaya CallPilot 201i Server Hardware Installation December 2010 ...
Страница 28: ...About the 201i server 28 Avaya CallPilot 201i Server Hardware Installation December 2010 ...
Страница 106: ...Preparing peripheral devices 106 Avaya CallPilot 201i Server Hardware Installation December 2010 ...
Страница 128: ...Connecting peripheral devices to the 201i server 128 Avaya CallPilot 201i Server Hardware Installation December 2010 ...