
Chapter 3: Preparing for installation
In this chapter
Unpacking and inspecting the 201i server
Switch and network requirements
Installation overview
Introduction
This section provides a high-level overview of the requirements and procedure for installing
the 201i server.
Before you begin
Ensure that proper power and grounding are available for all the power outlets serving the
Avaya CallPilot
®
server and its associated peripherals. Power for these devices must be wired
and fused independently of all other receptacles and referenced to the same ground as the
PBX system.
A qualified electrician must implement the single-point ground reference as required between
the power outlets of the Avaya CallPilot server and the power outlets of the switch.
Provide a sufficient number of properly grounded power outlets or power bars for all equipment.
For more information, refer to Chapter 2, "Grounding and power requirements", in the CallPilot
Planning and Engineering Guide.
Avaya CallPilot
®
201i Server Hardware Installation
December 2010 29
Содержание CallPilot 201i
Страница 1: ...Avaya CallPilot 201i Server Hardware Installation 5 0 NN44200 301 01 03 December 2010 ...
Страница 8: ...8 Avaya CallPilot 201i Server Hardware Installation December 2010 ...
Страница 28: ...About the 201i server 28 Avaya CallPilot 201i Server Hardware Installation December 2010 ...
Страница 106: ...Preparing peripheral devices 106 Avaya CallPilot 201i Server Hardware Installation December 2010 ...
Страница 128: ...Connecting peripheral devices to the 201i server 128 Avaya CallPilot 201i Server Hardware Installation December 2010 ...