Figure. 5.2.1 - 11. Common phase polarity problems.
The following image presents the most common problems with network rotation (mix phases). These
problems can be difficult to find because the measurement result is always the same in the relay. If two
phases are mixed together, the network rotation always follows the pattern IL1-IL3-IL2 and the
measured negative sequence current is therefore always 1.00 (in. p.u.).
A
AQ
Q-M255
-M255
Instruction manual
Version: 2.06
© Arcteq Relays Ltd
IM00020
25
Содержание AQ-M255
Страница 1: ...AQ M255 Motor protection IED Instruction manual...
Страница 2: ......
Страница 384: ...Figure 7 4 189 Example block scheme A AQ Q M255 M255 Instruction manual Version 2 06 382 Arcteq Relays Ltd IM00020...
Страница 405: ...Figure 8 14 211 Device installation A AQ Q M255 M255 Instruction manual Version 2 06 Arcteq Relays Ltd IM00020 403...