Page 105 of 130
Figure 113: Fiber drop in NIB
•
All aerial drops must have a transition or NIB box installed outside the house.
•
All LBs must be secured with screws on all Falcon Drops.
•
In Mass Market areas (Calgary/Edmonton, etc.) an outside Transition Box or NIB is not required
when using a Clear Curve fibre drop
but all drops must be stripped and have 1m+ of slack fibre
coiled up inside the LB.
•
Composite Drops
must have a NIB or Transition box installed, as the cables are not fire rated to be
used inside the home.