•
Pickup current of the overcurrent stage: 150% of generator rated current at rated
generator voltage;
•
Pickup voltage of the undervoltage stage: 70% of generator rated voltage;
•
Trip time: 3.0 s.
The overcurrent stage and the undervoltage stage shall be set in the following way:
1. Set
Operation
to
Enabled
.
2. Set
GlobalBaseSel
to the right value in order to select the Global Base Values
Group with
VBase
and
IBase
equal to the rated phase-to-phase voltage and the
rated phase current of the generator.
3. Set
StartCurr
to the value
150
%.
4. Set
Characteristic
to
IEC Def. Time
.
5. Set
tDef_OC
to
6000.00
s, if no trip of the overcurrent stage is required.
6. Set
VDepFact
to the value
100
% in order to ensure that the pickup value of the
overcurrent stage is constant, irrespective of the magnitude of the generator
voltage.
7. Set
Operation_UV
to
Enabled
to activate the undervoltage stage.
8. Set
StartVolt
to the values
70
%.
9. Set
tDef_UV
to
3.0
s.
10. Set
EnBlkLowV
to
Disabled
(default value) to disable the cut-off level for low-
voltage of the undervoltage stage.
The other parameters may be left at their default value.
Section 8
1MRK 511 401-UUS A
Current protection
240
Bay control REC670 2.2 ANSI
Application manual
Содержание Relion REC670
Страница 1: ...RELION 670 SERIES Bay control REC670 Version 2 2 ANSI Application manual ...
Страница 2: ......
Страница 26: ...20 ...
Страница 42: ...36 ...
Страница 96: ...90 ...
Страница 274: ...268 ...
Страница 292: ...286 ...
Страница 298: ...292 ...
Страница 308: ...302 ...
Страница 470: ...464 ...
Страница 514: ...508 ...
Страница 608: ...602 ...
Страница 646: ...640 ...
Страница 656: ...650 ...
Страница 657: ...651 ...