Operate
Angle1(2 ) = 180
o
Power1(2)
P
Q
IEC06000557-2-en.vsd
IEC06000557 V2 EN-US
Figure 91:
For reverse power the set angle should be 180° in the overpower
function
TripDelay1(2)
is set in seconds to give the time delay for trip of the stage after pick up.
Hysteresis1(2)
is given in p.u. of generator rated power according to equation
.
N
S
3 VBase IBase
=
×
×
EQUATION2047 V1 EN-US
(Equation 87)
The drop out power will be
Power1(2) - Hysteresis1(2)
.
The possibility to have low pass filtering of the measured power can be made as shown
in the formula:
1MRK 511 401-UUS A
Section 8
Current protection
Bay control REC670 2.2 ANSI
225
Application manual
Содержание Relion REC670
Страница 1: ...RELION 670 SERIES Bay control REC670 Version 2 2 ANSI Application manual ...
Страница 2: ......
Страница 26: ...20 ...
Страница 42: ...36 ...
Страница 96: ...90 ...
Страница 274: ...268 ...
Страница 292: ...286 ...
Страница 298: ...292 ...
Страница 308: ...302 ...
Страница 470: ...464 ...
Страница 514: ...508 ...
Страница 608: ...602 ...
Страница 646: ...640 ...
Страница 656: ...650 ...
Страница 657: ...651 ...