ANSI10000044-1-en.vsd
L
oa
d
T
ap
C
h
an
g
e
r
raise,lower
signals/alarms
position
MIM
BOM
IED
TRM
3ph or ph-ph or 1ph Currents
High Voltage Side
Low Voltage Side
Line Impedance R+jX
Load Center
3ph or ph-ph or 1ph Voltages
I
A
,I
B
,I
C
(Load Current) I
L
VL (Load Point Voltage)
VB (Busbar Voltage)
BIM
ANSI10000044 V1 EN-US
Figure 169:
Signal flow for a single transformer with voltage control
On the HV side, the three-phase current is normally required in order to feed the three-
phase over current protection that blocks the load tap changer in case of over-current
above harmful levels.
The voltage measurement on the LV-side can be made single phase-ground. However,
it shall be remembered that this can only be used in solidly grounded systems, as the
measured phase-ground voltage can increase with as much as a factor √3 in case of
ground faults in a non-solidly grounded system.
The analog input signals are normally common with other functions in the IED for
example, protection functions.
The LV-busbar voltage is designated V
B
, the load current I
L
and load
point voltage V
L
.
1MRK 511 401-UUS A
Section 14
Control
Bay control REC670 2.2 ANSI
411
Application manual
Содержание Relion REC670
Страница 1: ...RELION 670 SERIES Bay control REC670 Version 2 2 ANSI Application manual ...
Страница 2: ......
Страница 26: ...20 ...
Страница 42: ...36 ...
Страница 96: ...90 ...
Страница 274: ...268 ...
Страница 292: ...286 ...
Страница 298: ...292 ...
Страница 308: ...302 ...
Страница 470: ...464 ...
Страница 514: ...508 ...
Страница 608: ...602 ...
Страница 646: ...640 ...
Страница 656: ...650 ...
Страница 657: ...651 ...