Information
Action
xx1600001494
For IRB 2600ID - 8/2.0: cut the cable tie
that holds the harness loop together to
loosen the cabling and make it longer.
Fasten the cabling to the MP5 cable.
Tighten the cable ties gently with hand
force.
For IRB 2600ID - 15/1.85: remake the har-
ness loop if it is missing. Fasten the loop
to the MP5 cable. Tighten the cable ties
gently with hand force. Diameter of the loop
should be approximately Ø40 mm.
9
Note
If axis 4 is being moved in the continued
refitting process it must be returned to the
position it was when the mechanical stop
was removed in order to get the cable har-
ness spiral fitted correctly.
Check that axis 4 is in the same position
as it was when the cable harness was re-
moved.
10
CAUTION
When the spiral of the cable harness is ar-
ranged check that:
•
none of the cables are twisted
•
the two cables running in the spiral
runs parallel to each other all the
way
•
the cables are not arranged too tight
or too loose.
11
xx1000001004
Hold the cable harness with one hand and
cut the
cable strap
used as transport pro-
tection.
CAUTION
When the cable strap is cut, the spiral of
the cable harness can unwind and the
cables can start to cross each other.
12
Part:
A Cable strap used as transport protec-
tion
Continues on next page
Product manual - IRB 2600
235
3HAC035504-001 Revision: AD
© Copyright 2009-2023 ABB. All rights reserved.
4 Repair
4.3.3 Replacing the cable harness in the upper arm - IRB 2600ID
Continued
Содержание IRB 2600ID
Страница 1: ...ROBOTICS Product manual IRB 2600 ...
Страница 2: ...Trace back information Workspace 23B version a11 Checked in 2023 06 20 Skribenta version 5 5 019 ...
Страница 8: ...This page is intentionally left blank ...
Страница 114: ...This page is intentionally left blank ...
Страница 444: ...This page is intentionally left blank ...
Страница 456: ...This page is intentionally left blank ...
Страница 458: ...This page is intentionally left blank ...
Страница 464: ......
Страница 465: ......