Removing the cable harness
Use this procedure to remove the cable harness.
Information
Action
Decide which calibration routine to use, and
take actions accordingly prior to beginning
the repair procedure.
1
Move the robot to synchronization position.
2
DANGER
Turn off all:
•
electric power supply
•
hydraulic pressure supply
•
air pressure supply
to the robot, before entering the robot
working area.
3
Remove all extra equipment fitted on the
upper arm and wrist.
4
Secure the upper arm with roundslings in
an overhead crane or similar.
5
Remove the cover on the arm house.
6
A
B
C
D
xx1000000991
Disconnect the cables to motors axes 3, 4,
5 and 6.
7
Parts:
A Motor axis 4
B Motor axis 3
C MP connectors axes 3, 4, 5 and 6
(see markings for axis)
D FP connectors axes 3, 4, 5 and 6
(see markings for axis)
See section
•
Removing the wrist unit on page 350
Note
No need to remove the axis-6 motor. Only
the motor cables need to be disconnected.
Remove the
wrist
.
(This is done in order to be able to discon-
nect the motor cables of motor axis 6)
8
Continues on next page
Product manual - IRB 2600
229
3HAC035504-001 Revision: AD
© Copyright 2009-2023 ABB. All rights reserved.
4 Repair
4.3.3 Replacing the cable harness in the upper arm - IRB 2600ID
Continued
Содержание IRB 2600ID
Страница 1: ...ROBOTICS Product manual IRB 2600 ...
Страница 2: ...Trace back information Workspace 23B version a11 Checked in 2023 06 20 Skribenta version 5 5 019 ...
Страница 8: ...This page is intentionally left blank ...
Страница 114: ...This page is intentionally left blank ...
Страница 444: ...This page is intentionally left blank ...
Страница 456: ...This page is intentionally left blank ...
Страница 458: ...This page is intentionally left blank ...
Страница 464: ......
Страница 465: ......