86 Start-up
•
On the
CANopen I/O Mapping
tab, configure the I/O mapping.
Type names for the variables that refer to the signals of the
drive in the PLC program.
•
Open the PLC program, compile the project and download it to
the PLC.
Make sure that the variable names defined for the signals of
the drive are used in the PLC program, otherwise the
communication will not work.
Содержание FCAN-01
Страница 1: ... OPTION FOR ABB DRIVES CONVERTERS AND INVERTERS FCAN 01 CANopen adapter module User s manual ...
Страница 4: ......
Страница 10: ...10 Table of contents ...
Страница 14: ...14 Safety instructions ...
Страница 30: ...30 Mechanical installation ...
Страница 36: ...36 Electrical installation ...
Страница 81: ...Start up 81 ...
Страница 82: ...82 Start up 8 Configure the FCAN 01 properties Select the node boot up sequence ...
Страница 108: ...108 Communication profiles ...
Страница 152: ...152 Communication protocol ...
Страница 156: ...156 Diagnostics ...
Страница 160: ...160 Technical data ...
Страница 164: ...164 Appendix A Dictionary structure and entries ...
Страница 173: ...Appendix B CANopen error codes 173 FFFF Manufacturer specific Error code hex Meaning ...
Страница 174: ...174 Appendix B CANopen error codes ...