4-3
IM AQ1200-01EN
Measuring Optical Pulses
3
2
1
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
App
Index
20
4.1 Performing Real-time Measurement
Installation Completion Notification
Move the cursor to a position a little after the installation point before you perform real-time
measurement. If the fiber end detection position is the same as the cursor position when you perform
real-time measurement, the Instrument displays a message on the screen or sounds an alarm. For
details, see section 3.8.
Fiber end
Move the cursor to a position that is a little
after the installation point.
(Example: When the planned installation
point is at 30 km.)
You can perform measurements efficiently by moving the cursor to a position a little after
the installation point (depending on how fast fiber will be installed). This is because the
instrument notifies you of the work completion, which is your sign to measure the connection
loss at that point (splice, connection, etc.).
If work completion notification is turned on, “CheckPoint”
is displayed at the cursor.