12-4
IM AQ1200-01EN
7.
Press the
Project Transmission START
soft key to generate the optical signal
used to transmit the project information.
3.
Press the
Receive Project from Master
soft key.
On the menu, “Receive Project from Master”
changes to “Abort.”
After reception finishes, “Abort” changes back
to “Receive Project from Master” and the
following screen appears.
4.
Using the
rotary knob
and
ENTER
, select
Multi-Core
Loss Test
.
5.
Press the
Master/Slave
soft key to select
Master
.
6.
Create a new project (see section 12.1), or load a
project file (see the next page). The following menu
appears.
1.
Using the
rotary knob
and
ENTER
, select
Multi-Core
Loss Tes
t.
2.
Press the
Master/Slave
soft key to select
Slave
. The
following menu appears.
Slave
Master
Loss Test Screen
Loss Test Screen
On the menu, “Project Transmission START”
changes to “Project Transmission STOP.”
After transmission finishes, “Project
Transmission STOP” changes back to “Project
Transmission START” and the following screen
appears.
Optical Power Adjustment
Adjust as necessary (see section 12.4).
Now the master and slave share the same project information.
Loading a Project File
Load the same project file onto the master and the slave.
1.
Using the
rotary knob
and
ENTER
, select
Multi-Core Loss Test
.
2.
Press the
File
soft key to display the following screen.
Set the drive to load from (internal
memory, USB memory)
Loads the file
The project information is loaded from the
selected file, and the loss test screen
appears.
Using the
rotary knob
and
ENTER
,
select a project information file.
12.2 Sharing Projects