
POWR
TR
4-14
SECONDARY SHEAVE
5. Measure:
•
Ramp shoe thickness
a
Out of specification
→
Replace the ramp shoe.
Wear limit
a
:
1.0 mm (0.04 in)
ASSEMBLY
1. Install:
•
Stopper
•
Sliding sheave
Screw (stopper):
6.5 Nm (0.65 m · kg, 4.6 ft · lb)
2. Install:
•
Fixed sheave
1
•
Bolts
2
(along with the shims)
Bolt
2
:
10 Nm (1.0 m · kg, 7.2 ft · lb)
3. Install:
•
Secondary sheave spring
1
•
Spring seat
2
NOTE:
Hook the end of the secondary sheave spring into the
spring holes in the fixed sheave. Hook the other end
of the spring into the holes in the spring seat.
Standard spring position:
3-3 (VX700/VX700DX/SX700)
1-6 (MM700/VT700)
T
R
.
.
T
R
.
.
SCH4320
SCH4330
SCH4340
Summary of Contents for MM700F
Page 2: ......
Page 8: ......
Page 118: ...2 42 INSP ADJ CARBURETOR TUNING Guide for carburetion SCH2815 ...
Page 155: ...INSP ADJ ...
Page 445: ...8 19 ELEC ...
Page 523: ...9 22 SPEC ...
Page 545: ...9 22 SPEC ...
Page 567: ...9 22 SPEC ...
Page 568: ...SPEC 9 23 CABLE ROUTING SCH9010 ...
Page 570: ...SPEC 9 25 CABLE ROUTING SCH9010 ...
Page 572: ...SPEC 9 27 CABLE ROUTING SCH9020 ...
Page 574: ...SPEC 9 29 CABLE ROUTING SCH9030 ...
Page 576: ...SPEC 9 31 CABLE ROUTING SCH9030 ...
Page 578: ...SPEC 9 33 CABLE ROUTING SCH9040 ...
Page 580: ...SPEC 9 35 CABLE ROUTING SCH9050 ...
Page 582: ...SPEC 9 37 CABLE ROUTING SCH9050 ...
Page 584: ...SPEC 9 39 CABLE ROUTING SCH9060 ...
Page 588: ......