PROTOC 200
Installation
3 - 23
3.4.7
Connecting the standard solution
Prepare the standard solution for calibration in a suitable container as
described in section 3.2 P
REPARING
SOLUTIONS
. The container should
be large enough for the analyzer to run unattended for some time. The
reagent must be replenished at regular intervals.
Connecting the
standard solution
3.4.8
Connecting the cleaning solution
Prepare the cleaning solution as specified. The container should be
large enough for the analyzer to run unattended for some time. The re-
agent must be replenished at regular intervals.
Connecting the cleaning
solution
1
Place one end of the induction tube for the standard solution
into the container holding the standard solution.
2
Connect the tube to the analyzer (Connection F, Figure 3-3).
1
Place one end of the induction tube for the cleaning solution
into the container holding the cleaning solution.
2
Connect the induction tube to the analyzer (Connection K, Fig-
ure 3-3).
3
Also place one end of the drainage tube for the cleaning solu-
tion into the container holding the cleaning solution.
4
Connect the drainage tube to the analyzer (Connection L, Fig-
ure 3-3).
Summary of Contents for PROTOC 200
Page 1: ...PROTOC 200 TOC Analyzer ba43200e01 11 00 Operating Manual...
Page 10: ...Safety PROTOC 200 2 10...
Page 26: ...Installation PROTOC 200 3 26 Figure 3 9 Carrier gas valve 3...
Page 28: ...Installation PROTOC 200 3 28...
Page 54: ...What to do if PROTOC 200 7 54...
Page 59: ...PROTOC 200 Appendix 9 59 9 Appendix 9 1 Flow diagram...
Page 60: ...Appendix PROTOC 200 9 60 9 2 Socket connections for the analog output...