Checklist for commissioning the equipment
Check the following points before beginning measurement:
l
Is reagent solution available (not older than 1 month)?
l
Is fresh standard solution available for calibration?
l
Is cleaning solution available?
l
Is distilled water present in the U-tube?
l
Is carrier gas available at a pressure of 2.2 bar?
3.7
Commissioning
1
Carry out the preparatory steps as described in the checklist.
2
Switch on the main power supply to the PROTOC 200 (if it was
turned off).
3
Plug in the controller power cable.
4
Switch on the IR detector (if it was turned off).
5
Open the gas inlet.
6
Switch on the pump.
7
Check that liquids and gas are flowing.
8
Switch on the UV lamp.
9
Allow one hour for the analyzer to stabilize.
Switching on the
equipment
Summary of Contents for PROTOC 200
Page 1: ...PROTOC 200 TOC Analyzer ba43200e01 11 00 Operating Manual...
Page 10: ...Safety PROTOC 200 2 10...
Page 26: ...Installation PROTOC 200 3 26 Figure 3 9 Carrier gas valve 3...
Page 28: ...Installation PROTOC 200 3 28...
Page 54: ...What to do if PROTOC 200 7 54...
Page 59: ...PROTOC 200 Appendix 9 59 9 Appendix 9 1 Flow diagram...
Page 60: ...Appendix PROTOC 200 9 60 9 2 Socket connections for the analog output...