Installation
PROTOC 200
3 - 20
Figure 3-5 Lamp switch
Figure 3-6 Pump switch and main switch
2
Ensure that the lamp switch (2) is set to OFF.
3
Ensure that the pump switch (3) is set to OFF.
4
Plug in the analyzer power cable.
5
Switch on the main switch (4).
6
Switch on the IR detector (1). The warm-up period begins.
7
Make the remaining connections during this period.