Installation
PROTOC 200
3 - 16
Figure 3-2 Typical wall assembly with drilled holes (dimensions in mm)
203
101.5
ca.1800
647
457
min. 200
Analyzer
Controller
24
Typical wall assembly
5
Connect the analyzer power cable to Connection A
(see Figure 3-3).
6
Connect the controller to Connection B
(see Figure 3-3) on the analyzer.
Summary of Contents for PROTOC 200
Page 1: ...PROTOC 200 TOC Analyzer ba43200e01 11 00 Operating Manual...
Page 10: ...Safety PROTOC 200 2 10...
Page 26: ...Installation PROTOC 200 3 26 Figure 3 9 Carrier gas valve 3...
Page 28: ...Installation PROTOC 200 3 28...
Page 54: ...What to do if PROTOC 200 7 54...
Page 59: ...PROTOC 200 Appendix 9 59 9 Appendix 9 1 Flow diagram...
Page 60: ...Appendix PROTOC 200 9 60 9 2 Socket connections for the analog output...