
xii
Table of Contents
Product (daughter) ion mode......................................................................... 1-12
Precursor (parent) ion mode.......................................................................... 1-13
Multiple reaction monitoring mode .............................................................. 1-13
Constant neutral loss mode........................................................................... 1-14
ScanWave daughter scan mode..................................................................... 1-14
2 Preparing the Mass Spectrometer for Operation ........................... 2-1
Verifying the instrument’s state of readiness ................................................ 2-4
Monitoring the mass spectrometer LEDs....................................................... 2-4
Tuning and calibration information ............................................................... 2-4
Running the mass spectrometer at high flow rates ....................................... 2-5
Preparing the IntelliStart Fluidics system ................................................. 2-5
Installing the reservoir bottles........................................................................ 2-5
Purging the infusion pump.............................................................................. 2-7
Leaving the mass spectrometer ready for operation ............................... 2-9
Emergency shutdown of the mass spectrometer ....................................... 2-9
3 Preparing the ESI Source .................................................................... 3-1
Installing the ESI probe .................................................................................. 3-2
Removing the ESI probe.................................................................................. 3-6
Summary of Contents for Xevo TQ MS
Page 10: ...x...
Page 42: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 129: ...Replacing the air filter 4 81...
Page 130: ...4 82 Maintenance Procedures...
Page 146: ...B 4 Materials of Construction and Compliant Solvents...
Page 178: ...D 4 Plumbing the IntelliStart Fluidics system...