
4-54
Maintenance Procedures
2. Use the 3-mm Allen wrench to unscrew and remove the 4 screws
securing the PEEK ion block support to the adaptor housing.
3. Remove the PEEK ion block support from the adaptor housing.
4. Use the O-ring removal kit to carefully remove all the O-rings from the
PEEK ion block support (see
“Removing O-rings and seals” on
).
5. If any of the O-rings show signs of deterioration or damage, dispose of
them in accordance with local environmental regulations.
Warning:
The O-rings can be contaminated with
biohazardous and/or toxic materials. Dispose of them
according to local environmental regulations.
Securing screws
PEEK ion block
support
Adaptor housing
Hexapole
assembly
Summary of Contents for Xevo TQ MS
Page 10: ...x...
Page 42: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 129: ...Replacing the air filter 4 81...
Page 130: ...4 82 Maintenance Procedures...
Page 146: ...B 4 Materials of Construction and Compliant Solvents...
Page 178: ...D 4 Plumbing the IntelliStart Fluidics system...