
Connecting the Varian oil-filled roughing pump
C-5
1. Place the PTFE drip tray on the floor, within 5 feet of the instrument.
2. Place the pump on the PTFE drip tray.
3. Attach the NW25 tee to the roughing pump inlet flange using an NW25
center ring, and then secure the connection with an NW25 clamp, using
the 7-mm nut driver to install the clamp.
4. Attach the elbow to one of the open ports on the NW25 tee using an
NW25 center ring, and then secure the connection with an NW25 clamp,
using the 7-mm nut driver to install the clamp.
5. Attach the flanged end of a length of 1-inch ID vacuum hose to the
remaining open port on the NW25 tee using an NW25 center ring, and
then secure the connection with an NW25 clamp, using the 7-mm nut
driver to install the clamp.
6. Attach the flanged end of a second length of 1-inch ID vacuum hose to
the open port on the elbow using an NW25 center ring, and then secure
the connection with an NW25 clamp, using the 7-mm nut driver to
install the clamp.
Warning:
The roughing pump is heavy. To avoid injury, at least
two people must lift the pump.
TP02625
Pump inlet
NW25 tee
1-inch ID
vacuum hose
NW25 clamp
Clamps
Elbow
Summary of Contents for Xevo TQ MS
Page 10: ...x...
Page 42: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 129: ...Replacing the air filter 4 81...
Page 130: ...4 82 Maintenance Procedures...
Page 146: ...B 4 Materials of Construction and Compliant Solvents...
Page 178: ...D 4 Plumbing the IntelliStart Fluidics system...