
Connecting the liquid waste line
C-19
Connecting the liquid waste line
Required materials
•
Chemical-resistant, powder-free gloves
•
Waste container
To connect the liquid waste line
1. Place a suitable waste container below the mass spectrometer.
2. Slide a drain line over the barbed fitting of the drain (located at the
bottom, left-hand side of the mass spectrometer).
Warning:
The waste line and connection can be contaminated
with biologically hazardous materials. Always wear
chemical-resistant, powder-free gloves while performing this
procedure.
Caution:
To avoid distorting the drip tray or causing the drain
cup to leak, restrain the drain cup when attaching or removing
the waste line.
TP02684
Drain cup
Barbed fitting
Drain line
Summary of Contents for Xevo TQ MS
Page 10: ...x...
Page 42: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 129: ...Replacing the air filter 4 81...
Page 130: ...4 82 Maintenance Procedures...
Page 146: ...B 4 Materials of Construction and Compliant Solvents...
Page 178: ...D 4 Plumbing the IntelliStart Fluidics system...