
Input/output signal connectors
C-27
5. Insert the connector with the signal cable into the connection cover, and
position the clamp over the cable leads, and tighten the clamp into place
with the second self-tapping screw.
6. Place the second connection cover over the first cover, and snap it into
place.
TP02587
Cable leads
Clamp
TP02588
Signal connector
Connection cover
Summary of Contents for Xevo TQ MS
Page 10: ...x...
Page 42: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 129: ...Replacing the air filter 4 81...
Page 130: ...4 82 Maintenance Procedures...
Page 146: ...B 4 Materials of Construction and Compliant Solvents...
Page 178: ...D 4 Plumbing the IntelliStart Fluidics system...