
3-4
Preparing the ESI Source
ESI probe, mounted on the source enclosure
4. Tighten the probe locking ring to secure the probe in place.
5. Connect the ESI probe’s cable to the high voltage connector.
6. Open the access door to the fluidics valve (see the figure on
).
7. Using tubing greater than or equal to 0.004-inch ID, connect port 2 (the
top port) of the diverter valve to the ESI probe.
Recommendation:
To reduce peak broadening, use 0.004-inch ID tubing
for sample flow rates
1.2 mL/min; use 0.005-inch ID tubing for sample
flow rates
1.2 mL/min.
Caution:
To avoid nitrogen leakage, fully tighten the probe
locking ring.
Warning:
To avoid electric shock, do not use stainless steel
tubing to connect the diverter valve to the ESI probe; use the
PEEK™ tubing supplied with the instrument.
TP03128
ESI probe cable
ESI probe
Vernier probe adjuster
Probe locking ring
Source window
High voltage connector
Source enclosure
release
Vertical probe
adjuster
Summary of Contents for Xevo TQ MS
Page 10: ...x...
Page 42: ...2 10 Preparing the Mass Spectrometer for Operation...
Page 129: ...Replacing the air filter 4 81...
Page 130: ...4 82 Maintenance Procedures...
Page 146: ...B 4 Materials of Construction and Compliant Solvents...
Page 178: ...D 4 Plumbing the IntelliStart Fluidics system...