9
Initial start-up, inspection and maintenance
Further details regarding the individual steps
(cont.)
Gas supply pressure (flow pressure)
6.
Test the supply pressure (flow
pressure); it should be
H
17.4 to 25Ămbar for natural gas,
H
42.5 to 57.5Ămbar for LPG.
Use suitable test equipment with a
resolution of at least 0.1Ămbar to
measure the supply pressure.
Record the actual value in the
service report.
Take the action shown in the table.
Supply pressure (flow pressure) for Check
natural gas
LPG
below 17.4Ămbar below 42.5Ămbar Do not start up. Notify your mains or
LPG gas supplier.
17.4 up to
25Ămbar
42.5 up to
57.5Ămbar
Start up the boiler.
over 25Ămbar
over 57.5Ămbar
Install a separate gas pressure governor
upstream of the system and regulate
the pressure to 20Ămbar for natural gas
or 50Ămbar for LPG.
Notify your mains gas or LPG supplier.
7.
Shut down the boiler, close the
gas shut-off valve, remove the
pressure gauge and close test
nipple "PE"Ă
A
with the screw.
ă8.
Check the closing function of the
gas combination valve:
H
Connect the pressure gauge to
test nipple "PG"Ă
B
.
H
Start up the boiler.
H
Switch off the control unit.
H
The nozzle pressure (vacuum)
must rise to 0Ămbar within
1Ăsecond. Replace the gas valve
if the nozzle pressure rises
more slowly.
ă9.
Remove the pressure gauge, and
close test nippleĂ"PG"Ă
B
with
the screw.
10.
¨
ĂSafety instructions
Open the gas shut-off valve and
check for leaks on test nipples
"PE", "PG" and all gas
connections.
5692Ă485
G
B
PE
A
B
PG
Summary of Contents for Vitodens 200
Page 25: ...25 Initial start up inspection and maintenance 5692Ă485 GB ...
Page 96: ...96 Control unit for weather compensated mode with Comfortrol prog unit 5692Ă485 GB ...
Page 99: ...101 5692Ă485ĂGB ...
Page 105: ...109 Appendix Maint service Maint service Maint service Maint service 5692Ă485ĂGB ...
Page 107: ...111 Appendix Maint service Maint service Maint service Maint service 5692Ă485ĂGB ...
Page 109: ...113 Appendix Maint service Maint service Maint service Maint service 5692Ă485ĂGB ...