CAUTION
PROCEED WITH CAUTION.
DO NOT DAMAGE THE TABS AND/OR THEIR CORRESPONDING SLOTS. HANDLE THE PLASTIC
AND PAINTED COMPONENTS WITH CARE, DO NOT SCRATCH OR IMPAIR THEM.
During refitting of the central cover, ensure the correct position of the rubber protection. Refer to para-
graph "
Battery compartment - Inverter
" in the "
Bodywork
" chapter.
Sealed battery
If the vehicle is provided with a sealed battery, the only maintenance required is the check of its charge
and recharging, if necessary.
These operations should be carried out before delivering the vehicle, and on a six-month basis while
the vehicle is stored in open circuit.
Besides upon pre-delivery it is therefore necessary to check the battery charge and recharge it, if re-
quired, before storing the vehicle and afterwards every six months.
INSTRUCTIONS FOR BATTERY REFRESH AFTER OPEN CIRCUIT STORAGE
1) Voltage check
Before installing the battery on the vehicle, check the open circuit voltage with a standard tester.
- If voltage exceeds 12.60 V, the battery can be installed without any renewal recharge.
- If voltage is below 12.60 V, a renewal recharge is required as explained in 2).
2) Constant voltage battery charge mode
- Constant voltage charge equal to 14.40 - 14.70V
- Initial charge voltage equal to 0.3 - 0.5 for Nominal capacity
- Charge time:
10 - 12 h recommended
Minimum 6 h
Maximum 24 h
3) Constant current battery charge mode
- Charge current equal to 1/10 of the battery rated capacity
- Charge time: Maximum 5 h
See also
Battery installation
VRLA battery (valve-regulated lead-acid battery) Maintenance Free (MF)
WARNING
BATTERY ELECTROLYTE IS TOXIC AND IT MAY CAUSE SERIOUS BURNS. IT CONTAINS SUL-
PHURIC ACID. AVOID CONTACT WITH EYES, SKIN AND CLOTHING. IF IT ACCIDENTALLY
COMES INTO CONTACT WITH YOUR EYES OR SKIN, WASH WITH ABUNDANT WATER FOR
APPROX. 15 MIN. AND SEEK IMMEDIATE MEDICAL ATTENTION.
Electrical system
Vespa 946 E4-E5 EMEA-USA-ASIA (2021-)
ELE SYS - 100
Summary of Contents for 946 E4 EMEA 2021
Page 1: ...MANUALE STAZIONE DI SERVIZIO 1Q000894 Vespa 946 E4 E5 EMEA USA ASIA 2021 ...
Page 4: ......
Page 6: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 23: ...INDEX OF TOPICS TECHNICAL DATA DT ...
Page 44: ...INDEX OF TOPICS TOOLING TOOL ...
Page 50: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 63: ...Anti evaporation system Key 1 Canister Vespa 946 E4 E5 EMEA USA ASIA 2021 Maintenance MAIN 63 ...
Page 69: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL ...
Page 73: ...Vespa 946 E4 E5 EMEA USA ASIA 2021 Troubleshooting TROUBL 73 ...
Page 74: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 76: ...Electrical system Vespa 946 E4 E5 EMEA USA ASIA 2021 ELE SYS 76 ...
Page 125: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 133: ...INDEX OF TOPICS ENGINE ENG ...
Page 191: ...INDEX OF TOPICS INJECTION INJEC ...
Page 209: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 230: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 252: ...4 Rear brake calliper pipe Braking system Vespa 946 E4 E5 EMEA USA ASIA 2021 BRAK SYS 252 ...
Page 253: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 283: ...T Tank 277 Technical Data 24 Transmission 71 134 146 V Vehicle 17 25 26 126 128 ...