Valco Cincinnati
E-1
Appendix E—Maintenance Procedures
Introduction
This appendix contains recommended daily, weekly, 3-month, 6-month, and 12-month maintenance procedures for
the VC3700 system.
The maintenance procedures contained in this appendix are to be used for
cold-glue systems only. OTHERWISE, DAMAGE TO EQUIPMENT COULD
OCCUR.
Action
Date
Shift
Initials
1.
Clean the exterior portion of the glue valves, nozzle
tips, glue heads, etc.
2.
Purge the glue valves if necessary, and ensure proper
glue flow.
3.
Ensure that air and glue pressure settings are correct.
4.
If using glue insp ection:
Ensure that sensor is clean. (Lens must be clean
and clear with no scratches.)
Check sensor for proper height adjustment.
Adjust for proper sensitivity if necessary.
Daily Maintenance
Summary of Contents for VC3500
Page 1: ...VC3500 User s Manual Software Version 3 X Manual Number MCO35 Manual Release Date July 1999 ...
Page 19: ...Installation VC3500 User s Manual Valco Cincinnati 16 Figure 8 Internal Connections Diagram ...
Page 88: ...VC3700 User s Manual Software Version 3 X Manual Number MCO34 Manual Release Date July 1999 ...
Page 181: ...VC3500 VC3700 Troubleshooting Manual Manual Number MC048 Release Date May 1999 ...
Page 185: ...VC3500 VC3700 Troubleshooting Manual Valco Cincinnati Page 1 System Level Documents ...