47
® 2018 Valco Companies, Inc.
When the controller is powered on, you will see the following sequence of operations. These operations are
automatic and you should not press any keys at this time. This will take approximately 30 seconds.
The following screens will only appear on the new HMI boards (white screen).
Ventra II HMI Bootloader v 01.01.09
Compiled Mar 27 2018 @ 12:56:34
Ventra II HMI Bootloader v01.01.09
****************************************************************
Ventra II HMI Bootloader v 01.01.09
Application loaded on 06/01/2018 @ 23:46
GLOBAL PARAMETERS SETUP
Animal Type: Birds
When the controller has finished going through the sequence of operations
shown above
the following GLOBAL
PARAMETERS SETUP display screen will appear. Instructions for setting up the GLOBAL PARAMETERS SETUP
submenus are on the next page.
Control Power Up Sequence Completed
Press ENTER if you want to load and use a different parameter set than what you will be setting up as
you continue through the “Setting Up the Control” instructions.
More detail on parameter sets can be
found beginning on page 158.
Starting application: 1.00.00.52 05/23/18
Ventra PRO APP M1.00.00.52 0X9D036000
Check all connections before switching on your controller.
Power Up Sequence
*
The following screens will appear on all Ventra Pro controllers.
Checking Real Time Clock
Correct operation clears message
Start-Up Procedure 036 11:47
Setup SD CARD operations
Start-Up Procedure Options Press
ENTER to change.
Start-Up Procedure 036 11:47
Power Reset Slave Modules (5 seconds)