
Maintenance
8-2
ULVAC CRYOGENICS INCORPORATED
Table 8-1 Maintenance Parts and Intervals
S
: Scheduled maintenance
U
: Unscheduled maintenance or part replacement at fault
Item Parts
Interval
Remarks
Cryopump
U
U
U
80K baffle
15K cryopanel
replacement
Cryopump cleaning
15K cryopanel
At fault
When reassembling,
be sure to use new
indium gasket.
S
Insulation properties of
heater for regeneration
(*1)
Heater Every
month
Replace when
10M
Ω
or less
S
Pressure relief valve
Pressure
relief valve
Once or twice a month
Confirm the
safety of
exhaust gas
U
Calibration of cryometer
MBS-C
Cryometer
At fault
Use the (paid)
calibration service.
Refrigerator unit
R10 / R10R
R10RT
RM10
RM10T
S
S
S
S
Seal kit replacement
Driver assembly
Replacement
Motor bearing replacement
Cylinder bolt replacement
Seal kit
Driver bearing
Valve bearing
Set screw
Motor bearing
cylinder bolt
12,000h 16,000h
The maintenance
cycle depends on the
manner of operation.
S
Displacer replacement
1
st
/2
nd
stage of
displacer
24,000h 16,000h
S
Valve body replacement
Intake/Exhaust
valve body
At fault
At Fault
U
Other parts replacement
Other parts
At fault
Compressor unit
S
Adsorber replacement
Adsorber
Refer to the compressor unit instruction manual.
(*1): Only applicable to a cryopump system with heater.
Summary of Contents for CRYO-U Series
Page 2: ......
Page 8: ...F 6 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 24: ...This page intentionally left blank S 12 ULVAC CRYOGENICS INCORPORATED...
Page 26: ...IW 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 36: ...Cryopump Description 1 10 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 50: ...Installation 4 10 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 64: ...Regeneration 6 8 ULVAC CRYOGENICS INCORPORATED This page intentioanlly left blank...
Page 68: ...Disconnection and Storage 7 4 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 82: ...Maintenance 8 14 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 90: ...Troubleshooting A 8 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 92: ...Flexible Hose B 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 104: ...CS 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...