Regeneration
6-6
ULVAC CRYOGENICS INCORPORATED
for five minutes, the roughing process has been
completed. If it increased 6.5Pa or more in five
minutes, repeat the rough pumping procedures to
40Pa and the pressure buildup check.
Ⅳ.
Cool down
Open the roughing valve (RV1) after the pressure
buildup check has completed.
Then rough pump the cryopump to 40Pa. Close
the roughing valve (RV1) and start the cryopump.
When the cryopump is cooled down to the
prescribed temperature, the regeneration process
is completed.
・
When the main valve is not a reverse pressure compatible valve, start regeneration of the
cryopump after returning the vacuum chamber to atmospheric pressure so that the main
valve may not open during regeneration.
・
A pump case might dew during warming up depending on the installation environment.
In order to prevent a short circuit, please do not place an electric device under the
cryopump.
CAUTION
Yes
No
Press. buildup check
completed
Close roughing valve (RV1),
Power off Heater (option)
Cool-down completed
Start up cryopump
Yes
No
Regeneration completed
Open roughing valve (RV1)
Ⅳ
Ⅲ
Close roughing valve (RV1)
Pressure
≨
40Pa
Yes
No
Summary of Contents for CRYO-U Series
Page 2: ......
Page 8: ...F 6 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 24: ...This page intentionally left blank S 12 ULVAC CRYOGENICS INCORPORATED...
Page 26: ...IW 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 36: ...Cryopump Description 1 10 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 50: ...Installation 4 10 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 64: ...Regeneration 6 8 ULVAC CRYOGENICS INCORPORATED This page intentioanlly left blank...
Page 68: ...Disconnection and Storage 7 4 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 82: ...Maintenance 8 14 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 90: ...Troubleshooting A 8 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 92: ...Flexible Hose B 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Page 104: ...CS 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...