H9 ASD Installation and Operation Manual
27
Startup and Test
Before turning on the ASD ensure that:
•
R/L1
,
S/L2
, and
T/L3
are connected to the 3-phase input power.
•
U/T1
,
V/T2
, and
W/T3
are connected to the motor.
• The 3-phase input voltage is within the specified tolerance.
• There are no shorts and all grounds are secured.
• All personnel are at a safe distance from the motor and the motor-driven equipment.
DANGER
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.ctiautomation.net - Email: [email protected]