ELECTRICAL SYSTEM
7-25
1-/ 2-Cylinder
Test 2a - Stop Circuit Main Key Switch Test (if so equipped)
This test is used to determine whether the main key switch and
connecting wiring are functioning normally.
NOTE
Make sure all electrical terminals are connected
during this test except those that are noted in the
test procedure.
Check for continuity between chassis ground and
the ground connection for the magneto plate, CD
Unit, and ignition coils beAore conducting the
following procedure.
All continuity tests must be conducted with negative
lead kom battery disconnected or you may damage
the meter.
1. Remove negative lead from battery.
2. Disconnect main key switch terminals
(1)
,
(2)
,
(3)
and
(4)
.
3. Set analog multimeter to check continuity. Connect one meter
lead to terminal
(1)
and the other to terminal
(3)
.
4. Turn main key switch
(7)
to OFF position, meter must show
continuity. If not, replace main key switch.
5. Turn main key switch to ON position, meter must not show continuity.
lf it does, replace it.
4
4
4
T1475
4
Summary of Contents for 2 Stroke Cylinder Series
Page 1: ...PNo 003 21035 1 0509 NB 1000 Printrd in Japan 1 05 8 23 1 33 PM 1...
Page 99: ...SECTION 4 4 18 1 2 Cylinder T2201 16...
Page 103: ...POWERHEAD 4 23 1 2 Cylinder POWERHEAD Typical 1 Cylinder T1676...
Page 104: ...SECTION 4 4 24 1 2 Cylinder Typical 2 Cylinder T1677...
Page 140: ...SECTION 5 5 22 1 2 Cylinder 8 T1620...
Page 162: ...SECTION 6 6 10 1 2 Cylinder GEARCASE Typical Gearcase 2 5 3 5 T1709...
Page 165: ...GEARCASE 6 13 1 2 Cylinder Typical Gearcase 3 5B T1714...
Page 169: ...GEARCASE 6 17 1 2 Cylinder Typical Gearcase 8 9 8 9 9 15 18 25 30 40 T1723...
Page 214: ...SECTION 7 7 22 1 2 Cylinder Ignition System Performance Testing Flow Chart 1 T1557 1...