GEARCASE
6-23
1-/ 2-Cylinder
Assembly
CAUTION
Gearcase must be secured in a suitable holding
fixture during assembly.
Assembly — 2.5
/
3.5
1. Install propeller shaft assembly.
2. lnstall water pump case.
3. lnstall pump impeller key.
4. Install pump impeller.
Assembly — 3.5B
1. Install the clutch, clutch spring and the clutch push rod to propeller
shaft.
2. Install propeller shaft assembly.
3. Fix the clutch cam to the cam rod with a spring pin, and insert it
into the gear case. Also, insert the drive shaft and install the lower
pump case.
4. Lift the drive shaft a little and install the bevel gear B.
5. Install the pump guide plate gasket, guide plate, cam rod bush
and upper pump case gasket.
6. lnstaII the pump impeller key.
7. lnstall the pump impeIIer.
8. Install the pump case liner in the case.
9. Install the water pump case.
NOTE
When installing the water tube, apply oil to the inner
circumference of the lower water pipe rubber seal.
2.5 / 3.5 only
10. Install the gear case head.
2.5 / 3.5 Only
11. lnstall the upper driveshaft and attach the driveshaft guard pipe
Summary of Contents for 2 Stroke Cylinder Series
Page 1: ...PNo 003 21035 1 0509 NB 1000 Printrd in Japan 1 05 8 23 1 33 PM 1...
Page 99: ...SECTION 4 4 18 1 2 Cylinder T2201 16...
Page 103: ...POWERHEAD 4 23 1 2 Cylinder POWERHEAD Typical 1 Cylinder T1676...
Page 104: ...SECTION 4 4 24 1 2 Cylinder Typical 2 Cylinder T1677...
Page 140: ...SECTION 5 5 22 1 2 Cylinder 8 T1620...
Page 162: ...SECTION 6 6 10 1 2 Cylinder GEARCASE Typical Gearcase 2 5 3 5 T1709...
Page 165: ...GEARCASE 6 13 1 2 Cylinder Typical Gearcase 3 5B T1714...
Page 169: ...GEARCASE 6 17 1 2 Cylinder Typical Gearcase 8 9 8 9 9 15 18 25 30 40 T1723...
Page 214: ...SECTION 7 7 22 1 2 Cylinder Ignition System Performance Testing Flow Chart 1 T1557 1...