MIDSECTION
5-9
1-/ 2-Cylinder
Installation
1. lnstall the tiller steering assembly.
2. Connct throttle cable(s) (or throttle shaft).
3. Adjust screw
(12)
by tightening or loosening it to
obtain proper grip turning resistance.
9.9/15/18 Linkage Adjustment
Adjustment of Throttle Mechanism
CAUTION
Make this adjustment only after fitting the power
unit to the lower unit.
CAUTION
Apply grease on sliding parts and ball joints of
the advancer arm bushing.
CAUTION
Adjust link rods 5-60L and 5-65L as shown in
figure [8] prior to adjusting ignition timing.
Item
Description
1.
Timing Mark
2.
Ignition Timing Inspection Line
3.
Link Rod 5-65L
4.
Link Rod 5-60L
5.
Advancer Arm
6.
Stopper Bolt (Fully-open)
7.
Stopper Bolt (Fully-closed)
8.
M8 Nylon Nut
2
3
4
2
3
7
T2002
7
Summary of Contents for 2 Stroke Cylinder Series
Page 1: ...PNo 003 21035 1 0509 NB 1000 Printrd in Japan 1 05 8 23 1 33 PM 1...
Page 99: ...SECTION 4 4 18 1 2 Cylinder T2201 16...
Page 103: ...POWERHEAD 4 23 1 2 Cylinder POWERHEAD Typical 1 Cylinder T1676...
Page 104: ...SECTION 4 4 24 1 2 Cylinder Typical 2 Cylinder T1677...
Page 140: ...SECTION 5 5 22 1 2 Cylinder 8 T1620...
Page 162: ...SECTION 6 6 10 1 2 Cylinder GEARCASE Typical Gearcase 2 5 3 5 T1709...
Page 165: ...GEARCASE 6 13 1 2 Cylinder Typical Gearcase 3 5B T1714...
Page 169: ...GEARCASE 6 17 1 2 Cylinder Typical Gearcase 8 9 8 9 9 15 18 25 30 40 T1723...
Page 214: ...SECTION 7 7 22 1 2 Cylinder Ignition System Performance Testing Flow Chart 1 T1557 1...