ULTRA-CUT 200 XT
3-42
INSTALLATION
Manual 0-5304
!
CAUTION
The gas and coolant leads include compression fittings. Do not use sealant on these con-
nections.
Slowly apply pressure to the gas lines. Check for leaks at all connections before continuing.
If there are no leaks, shut off the gas supplies and continue with installation.
7. Connect the pilot lead to the Torch Head. Press the two ends of the connector firmly together. Thread the plastic lead
cover/connector onto the mating Torch Head connector.
8. Press the Torch Head Assembly upward to connect to the Mounting Tube. Pull the leads back as needed to ensure a
proper fit through the Mounting Tube and Torch Leads End Cap. Hold the Torch Head Assembly stationary; rotate the
Mounting Tube to thread it onto the Torch Head.
!
CAUTION
Ensure that the leads do not twist within the mounting tube. Leads must lie as
shown in the installation sketch.
9. The lower end of the Mounting Tube includes four threaded holes. Install an Allen set screw in any of the threaded holes
to secure the Torch Head Assembly to the Mounting Tube.
10. Install the appropriate consumable parts as shown on the following pages. The torch manual includes diagrams showing
the correct parts to install, depending on the metal to be cut and the gases in use.
Summary of Contents for ULTRA-CUT 200 XT
Page 6: ...This Page Intentionally Blank...
Page 15: ...ULTRA CUT 200 XT Manual 0 5304 SAFETY INSTRUCTIONS 1 5 This Page Intentionally Blank...
Page 28: ...ULTRA CUT 200 XT SPECIFICATIONS Manual 0 5304 This Page Intentionally Blank...
Page 76: ...ULTRA CUT 200 XT INSTALLATION Manual 0 5304 This Page Intentionally Blank...
Page 160: ...ULTRA CUT 200 XT APPENDIX Manual 0 5304 APPENDIX 17 Cap Bias Bottom PCB Layout Art A 11685_AB...
Page 162: ...ULTRA CUT 200 XT APPENDIX Manual 0 5304 APPENDIX 19 Suppressor PCB Layout Art A 11684_AB...
Page 165: ...ULTRA CUT 200 XT Manual 0 5304 APPENDIX A 39 This Page Intentionally Blank...
Page 227: ......