![Tektronix 2445 Instruction Manual Download Page 351](http://html.mh-extra.com/html/tektronix/2445/2445_instruction-manual_1078867351.webp)
Product:
2445 SERVICE_____________
Date:
2-16-83_____
Change Reference:
.
C
1/283
DESCRIPTION
TEXT CHANGES (cont)
Page 5-15 CAL 04-CH 2 DELAY ENABLE/DISABLE
Step 4, part k
CHANGE— to
read as
follows:
k. CHECK-Readout indicates "CH 2 DLY - TURN A" and that the
A control will move the leading dege of the CH 2 trace at
least 1 division to either side of the CH 1 trace.
Page 7-2
Option A5 (Switzerland)
CHANGE— the part number for the Power cord to 161-0167-00
REPLACEABLE ELECTRICAL PARTS LIST CHANGES
EFF SN: SEE BELOW
CHANGE TO:
PC
A4
A1R416
A2C1272
670-7278-00
315-0432-00
281-0774-00
B010100
B010100
CKT BOARD ASSY: READOUT
RES,FXD,CMPSN:
4.3K OHM,5%,0.25W
CAP,FXD,CER DI: 0.022 MFD,20%,100V
112
105
ADD:
A9R1830
307-0110-00
B010100
RES,FXD,CMPSN: 3 0HM,5%,0.25W
116
REMOVE:
A9CR1951
152-0787-00
B010478
SEMICOND DEVICE: RECT,SI,12KV,3MA,A-LZV 156
DIAGRAM CHANGES
EFF SN: EFF ALL SERIAL NUMBERS except for removing CR1951 which is B010478
DIAGRAM <£> HIGH VOLTAGE SUPPLY AND CRT
ADD—R1830 (3ft) in series from U1830 pin 1 (location 10H) to V900 pin 1.
REMOVE—CR1951 (location 7E) and connect CR1950 to CR1930.
ACCESSORIES
OPTIONAL ACCESSORIES
CHANGE—the description for part number 161-0104-08 to read as follows:
CABLE ASSY,PWR:
3,18 AWG,240V,98.0 L
(NORTH AMERICAN)
ADD-161-0167-00
CABLE ASSY,PWR: 3.0 X 0.75,6A,240V,2.5M
(SWISS)
Page
2
of 2
Summary of Contents for 2445
Page 1: ...Tektronix 2445 OSCILLOSCOPE SERVICE INSTRUCTION MANUAL ...
Page 11: ...2445 Service 3829 01 The 2445 Oscilloscope ...
Page 44: ...Theory of Operation 2445 Service 3831 10A Figure 3 1 Block diagram ...
Page 45: ...Theory of Operation 2445 Service 3831 10B Figure 3 1 Block diagram cont 3 3 ...
Page 210: ...3829 58 Figure 9 4 2445 block diagram ...
Page 214: ......
Page 217: ......
Page 219: ...2445 382 72 ...
Page 222: ...2445 ...
Page 231: ...A 1 t C t t F t G t H t ...
Page 233: ......
Page 236: ......
Page 238: ...2445 392 1 75 ...
Page 244: ......
Page 247: ...A 1 C _____ D E F G H J 2445 3811 74 ...
Page 248: ...1 2 3 4 5 6 7 8 9 i o 2445 DISPLAY SEQUENCER TRIG GERING A4B SWEEPS ...
Page 253: ......
Page 263: ... 0 2445 J8 i S ...
Page 264: ...1 2 3 4 5 6 7 i 8 I i 9 10 2445 READOUT ...
Page 275: ......
Page 278: ......
Page 281: ......
Page 283: ... 8VJNR EG 3S 5 fROM P232 5 10 A 15VUNREG 8S F R O Mn i 2445 3 0 2 S 8 I ...
Page 286: ...2445 3823 82 ...
Page 290: ...B H le w o q 87V T S o I R v n i U1 R1873 PARTIAL A9 HIGH VOLTAGE BOARD 2445 ...
Page 299: ...2445 Service DAC REF A5 CONTROL ADJUSTMENT LOCATIONS 3 ...
Page 300: ......
Page 304: ...2 R E TU R N T O 1 ...
Page 305: ...ERROR MESSAGE DIAGNOSTICS ...
Page 306: ...ERROR MESSAGE DIAGNOSTICS ...
Page 307: ...O A A C t rnra g i tiw c t 3829 89 ...
Page 308: ...RETURN TO ...
Page 309: ...FRONT PANEL TROUBLESHOOTING ...
Page 310: ...FRONT PANEL TROUBLESHOOTING ...
Page 311: ...2445 Service 3829 90 ...
Page 316: ...R E TU R N T O v 1 y ...
Page 317: ...SWEEP TROUBLESHOOTING PROCEDURE ...
Page 323: ......
Page 324: ...2445 Service 3829 85 ...
Page 325: ......
Page 326: ... KERNEL NOP DIAGNOSTIC PROCEDURE ...
Page 327: ...10 POWER SUPPLY TROUBLESHOOTING PROCEDURE 3829 94 ...
Page 330: ......
Page 334: ...2445 Service REGULATOR TROUBLESHOOTING PROCEDURE 3829 93 ...
Page 338: ......
Page 346: ...12 2445 SERVICE ...
Page 347: ...2445 SERVICE ...
Page 348: ...2445 SERVICE ...