Specification—2445 Service
Table 1-1 (cont)
Characteristics
Performance Requirements
VERTICAL DEFLECTION SYSTEM -CHANNEL 1 AND CHANNEL 2 (cont)
Common-mode Rejection Ratio (CMRR)
A t least 20:1 at 50 MHz for common-mode signals of eight divisions
or less, w ith VAR VO LTS/D IV control adjusted fo r best CMRR at
50 kHz at any VO LTS/DIV switch setting from 5 mV to 5 V; at
least 20:1 at 20 MHz at 2 mV per division.
Channel Isolation
100:1 or greater attenuation o f the deselected channel at 100 MHz;
50:1 or greater attenuation at 150 MHz, fo r an eight-division input
signal from 2 mV per division to 500 mV per division, w ith equal
VO LTS/DIV switch settings on both channels.
Displayed Channel 2 Signal Delay w ith Respect
to Channel 1 Signal
Adjustable through a range o f at least —500 ps to +500 ps.
Input R and C (1 MH)
Resistance
1 M£2 ±0.5%.a
Capacitance
15 pF ±2 pF.a
Maximum Input Voltage
^
400 V (dc + peak ac);
800 V p-p ac at 10 kHz or less.3
Input R (50 £2)
Resistance
50 f2 ±1%.a
VSWR (DC to 150 MHz)
1.3:1 or less 3
Maximum Input Voltage
^
5 V rms; 0.5 W-seconds during any 1-s interval fo r instantaneous
voltage from 5 V to 50 V.
Cascaded Operation
CH 2 SIGNAL OUT into Channel 1 input; DC coupled using a
50-£2 RG-58C/U coaxial cable, terminated in 50 f2 at the Channel 1
input. Channel 1 and Channel 2 VO LTS/DIV switch set to 2 mV.
Bandwidth
Dc to 50 MHz or greater.
Deflection Factor
400 juV per division ±10%.
VERTICAL DEFLECTION SYSTEM -CHANNEL 3 AND CHANNEL 4
Deflection Factor
Values
0.1 V per division and 0.5 V per division.
Accuracy
Within ±10%.
Frequency Response
Six-division reference signal, from a terminated 50-f2 system.
—3 dB Bandwidth
w ith standard accessory probe
—4.7 dB Bandwidth
w ith external 5G-i2 termination
DC to 150 MHz
DC to 150 MHz
Performance Requirement not checked in manual.
1-3
Summary of Contents for 2445
Page 1: ...Tektronix 2445 OSCILLOSCOPE SERVICE INSTRUCTION MANUAL ...
Page 11: ...2445 Service 3829 01 The 2445 Oscilloscope ...
Page 44: ...Theory of Operation 2445 Service 3831 10A Figure 3 1 Block diagram ...
Page 45: ...Theory of Operation 2445 Service 3831 10B Figure 3 1 Block diagram cont 3 3 ...
Page 210: ...3829 58 Figure 9 4 2445 block diagram ...
Page 214: ......
Page 217: ......
Page 219: ...2445 382 72 ...
Page 222: ...2445 ...
Page 231: ...A 1 t C t t F t G t H t ...
Page 233: ......
Page 236: ......
Page 238: ...2445 392 1 75 ...
Page 244: ......
Page 247: ...A 1 C _____ D E F G H J 2445 3811 74 ...
Page 248: ...1 2 3 4 5 6 7 8 9 i o 2445 DISPLAY SEQUENCER TRIG GERING A4B SWEEPS ...
Page 253: ......
Page 263: ... 0 2445 J8 i S ...
Page 264: ...1 2 3 4 5 6 7 i 8 I i 9 10 2445 READOUT ...
Page 275: ......
Page 278: ......
Page 281: ......
Page 283: ... 8VJNR EG 3S 5 fROM P232 5 10 A 15VUNREG 8S F R O Mn i 2445 3 0 2 S 8 I ...
Page 286: ...2445 3823 82 ...
Page 290: ...B H le w o q 87V T S o I R v n i U1 R1873 PARTIAL A9 HIGH VOLTAGE BOARD 2445 ...
Page 299: ...2445 Service DAC REF A5 CONTROL ADJUSTMENT LOCATIONS 3 ...
Page 300: ......
Page 304: ...2 R E TU R N T O 1 ...
Page 305: ...ERROR MESSAGE DIAGNOSTICS ...
Page 306: ...ERROR MESSAGE DIAGNOSTICS ...
Page 307: ...O A A C t rnra g i tiw c t 3829 89 ...
Page 308: ...RETURN TO ...
Page 309: ...FRONT PANEL TROUBLESHOOTING ...
Page 310: ...FRONT PANEL TROUBLESHOOTING ...
Page 311: ...2445 Service 3829 90 ...
Page 316: ...R E TU R N T O v 1 y ...
Page 317: ...SWEEP TROUBLESHOOTING PROCEDURE ...
Page 323: ......
Page 324: ...2445 Service 3829 85 ...
Page 325: ......
Page 326: ... KERNEL NOP DIAGNOSTIC PROCEDURE ...
Page 327: ...10 POWER SUPPLY TROUBLESHOOTING PROCEDURE 3829 94 ...
Page 330: ......
Page 334: ...2445 Service REGULATOR TROUBLESHOOTING PROCEDURE 3829 93 ...
Page 338: ......
Page 346: ...12 2445 SERVICE ...
Page 347: ...2445 SERVICE ...
Page 348: ...2445 SERVICE ...