![Tektronix 2445 Instruction Manual Download Page 116](http://html.mh-extra.com/html/tektronix/2445/2445_instruction-manual_1078867116.webp)
Performance Check— 2445 Service
c. CHECK— The positive portion of the 4-division signal
display is blanked out.
d. VERIFY— Duration of the high level is between 1 ms
and 1.2 ms.
d. Disconnect the test setup and adjust the crt INTENSI
TY as desired.
e. VERIFY— Duration of the low level is between 80
ns
and 150 ms.
3. Check A and B GATE
TRIGGER HOLDOFF.
a. Set:
A SEC/DIV
B SEC/DIV
At
AREF OR DLY POS
TRIGGER
MODE
HOLDOFF
Outputs and Verify
100
MS
50
ms
(knob in)
Off (DLY readout)
Zero DLY readout
AUTO
Minimum (CCW)
b. Connect a test oscilloscope to the A GATE OUT con
nector (located on the 2445 rear panel) via a 50
Q
BNC
cable.
c. CHECK—Test oscilloscope displays a signal with a
high level between 2.4 V and 5 V and a low level between
0 V and 0.4 V.
f. VERIFY— Duration of the low level increases to at
least 10 times the time measured in part e when the 2445
HOLDOFF control is rotated to the maximum CW position
(but not in the detent).
g. Move the 50 Q BNC cable from the A GATE OUT
connector to the B GATE OUT connector.
h. CHECK—Test oscilloscope displays a signal with a
high level between 2.4 V and 5 V and a low level between
0 V and 0.4 V.
i. VERIFY— Duration of the high portion of the signal is
between 500
ms
and 600
ms
.
j. Disconnect the test setup.
4-27
Summary of Contents for 2445
Page 1: ...Tektronix 2445 OSCILLOSCOPE SERVICE INSTRUCTION MANUAL ...
Page 11: ...2445 Service 3829 01 The 2445 Oscilloscope ...
Page 44: ...Theory of Operation 2445 Service 3831 10A Figure 3 1 Block diagram ...
Page 45: ...Theory of Operation 2445 Service 3831 10B Figure 3 1 Block diagram cont 3 3 ...
Page 210: ...3829 58 Figure 9 4 2445 block diagram ...
Page 214: ......
Page 217: ......
Page 219: ...2445 382 72 ...
Page 222: ...2445 ...
Page 231: ...A 1 t C t t F t G t H t ...
Page 233: ......
Page 236: ......
Page 238: ...2445 392 1 75 ...
Page 244: ......
Page 247: ...A 1 C _____ D E F G H J 2445 3811 74 ...
Page 248: ...1 2 3 4 5 6 7 8 9 i o 2445 DISPLAY SEQUENCER TRIG GERING A4B SWEEPS ...
Page 253: ......
Page 263: ... 0 2445 J8 i S ...
Page 264: ...1 2 3 4 5 6 7 i 8 I i 9 10 2445 READOUT ...
Page 275: ......
Page 278: ......
Page 281: ......
Page 283: ... 8VJNR EG 3S 5 fROM P232 5 10 A 15VUNREG 8S F R O Mn i 2445 3 0 2 S 8 I ...
Page 286: ...2445 3823 82 ...
Page 290: ...B H le w o q 87V T S o I R v n i U1 R1873 PARTIAL A9 HIGH VOLTAGE BOARD 2445 ...
Page 299: ...2445 Service DAC REF A5 CONTROL ADJUSTMENT LOCATIONS 3 ...
Page 300: ......
Page 304: ...2 R E TU R N T O 1 ...
Page 305: ...ERROR MESSAGE DIAGNOSTICS ...
Page 306: ...ERROR MESSAGE DIAGNOSTICS ...
Page 307: ...O A A C t rnra g i tiw c t 3829 89 ...
Page 308: ...RETURN TO ...
Page 309: ...FRONT PANEL TROUBLESHOOTING ...
Page 310: ...FRONT PANEL TROUBLESHOOTING ...
Page 311: ...2445 Service 3829 90 ...
Page 316: ...R E TU R N T O v 1 y ...
Page 317: ...SWEEP TROUBLESHOOTING PROCEDURE ...
Page 323: ......
Page 324: ...2445 Service 3829 85 ...
Page 325: ......
Page 326: ... KERNEL NOP DIAGNOSTIC PROCEDURE ...
Page 327: ...10 POWER SUPPLY TROUBLESHOOTING PROCEDURE 3829 94 ...
Page 330: ......
Page 334: ...2445 Service REGULATOR TROUBLESHOOTING PROCEDURE 3829 93 ...
Page 338: ......
Page 346: ...12 2445 SERVICE ...
Page 347: ...2445 SERVICE ...
Page 348: ...2445 SERVICE ...