6
Performance Checks
Test Procedures
6-21
SYNC Qualifier - Bit
Equipment: Oscilloscope
Preparation:
1. Configure the oscilloscope as follows:
Time Base:
As required by the test
Amplitude:
2 V/div
2. Connect 2074 SYNC output CH1 to the oscilloscope input
3. Configure model 2074 as follows:
Ch1 Output:
On
Test Procedure:
1. Verify trace on the oscilloscope shows synchronization pulses at
1
μ
s intervals.
Test Results
Pass
Fail
2. Remove the cable from channel 1 and repeat the test on
channels 2, 3, and 4, using the appropriate sync output
connection on the rear panel for each channel
Test Results
Pass
Fail
SYNC Qualifier -
LCOM
Equipment: Oscilloscope
Preparation:
1. Configure the oscilloscope as follows:
Time Base:
As required by the test
Amplitude:
2 V/div
2. Connect the 2074 CH1 output to the oscilloscope input (1)
3. Connect the 2074 rear panel CH1 SYNC output to the
oscilloscope input (2)
4. Configure model 2074 channel as follows:
Waveform: Sine
Run Mode:
Burst
Burst Count:
10
Re-trigger On
Re-trig period:
10
μ
s
CH1 Output:
On
Test Procedure:
1. Manually trigger the 2074
2. Verify trace on the oscilloscope shows synchronization pulse
having 9
μ
s pulse width. Verify the SYNC is high for the
duration of the burst.
Summary of Contents for 5064
Page 26: ...1 5 Figure 1 2 ArbConnection The Control Panels Figure 1 3 ArbConnection The Wave Composer...
Page 71: ...2074 User Manual 2 18 This page intentionally left blank...
Page 145: ...2074 User Manual 3 74 Figure 3 48 Reading the 2074 Internal Temperature...
Page 220: ...4 ArbConnection Logging SCPI Commands 4 75 Figure 4 58 Log File Example...
Page 221: ...2074 User Manual 4 76 This page was intentionally left blank...
Page 333: ...2074 User Manual 7 2...
Page 359: ...2074 User Manual 7 28 This page was intentionally left blank...
Page 360: ...Appendices Appendix Title Page A Specifications A 1 1...
Page 361: ...2074 User Manual 2...